Fully verified Commercial dry floodproofing (engineered barriers) Medford, MA · New England Coast

BOND Civil & Utility Construction, Inc.

Installed the floodgates at Fenway Station and the large steel flood doors at the Miner Street tunnel portal for the MBTA's Fenway Portal Flood Protection Project, a $22.2 million scheme completed in November 2020. One of very few New England contractors with a public-agency contract record specifically for flood gate and flood door installation on a non-residential structure.

Credentials & verification

Services

  • flood gate installation
  • flood door installation
  • transit tunnel flood protection

Service area

Greater Boston MA · New England

Our verification notes

This is an installer and general contractor, not a barrier manufacturer - it did not design or supply the gates. The MBTA award record lists the entity as BOND BROS. INC.; the civil and utility subsidiary publicised completion.

Sources checked

  • https://bc.mbta.com/business_center/bidding_solicitations/awarded_contracts/?cnumber=T27CN02
  • https://www.mbta.com/projects/fenway-portal-flood-protection-project

Last verified 2026-08-13. This is an independent listing, not an endorsement, and we are not affiliated with BOND Civil & Utility Construction, Inc.. Confirm the current license, insurance and references directly before signing any contract.

← Flood risk & providers in New England Coast